Opens in a new tab

Delegation

Handing off estimates and pricing

Write your pricing rules down, set a clear dollar limit for managers, and review a sample of estimates rather than checking every file yourself.

It is four o’clock on a Tuesday afternoon, the field crews are wrapping up, and six estimate folders are sitting on your desk waiting for numbers. Until you price them, nothing goes out to the customer, so you stay until seven calculating labor hours and material markups yourself.

In many privately held trade, distribution, and service businesses, owners recognize this pattern well. Pricing feels risky to hand off because a bad number either loses the job or loses money on the work. Yet as long as every estimate waits on your desk, turnaround slows down and your week stays tied to routine pricing.

Write the pricing rules down first

You cannot delegate judgment that exists only in your head. Before a project manager or estimator can price a job accurately, the rules you use instinctively must be put on paper in plain language. Start by documenting the standard inputs for your most common jobs:

  • Labor pricing rules: How crew hours, standard rates, and travel or setup allowances are calculated for routine work.
  • Material pricing rules: How material costs are tallied and marked up across standard job categories.
  • Outside work rules: How subcontractor and rental equipment costs are priced and marked up.
  • Second-look conditions: The specific job traits that always require a second look from you before an estimate goes out.

Consider how this works in an ordinary commercial plumbing contractor business. Instead of asking an estimator to guess how you figure an overtime call or a trenching rental, the sheet states the exact labor rate per hour, the standard markup on pipe and fittings, and the rule that any job requiring a street cut or specialized equipment goes to you for review. Putting these rules on paper gives another person a clear standard to follow and gives you a baseline to review against.

Set a dollar limit and define authority

Handing off pricing does not mean handing over the biggest bid of the year on day one. Establish a clear dollar limit and state the level of authority when the task is handed over. Below the limit, a manager operates at level 4 of the five levels of authority: decide and act, and tell me afterwards. Above the limit, the manager operates at level 2: bring me options with your recommendation, and I decide.

When you hand over the estimating task itself, frame it with a one-page briefing that covers six lines: the result wanted, why it matters, the limits such as the dollar ceiling and minimum margin rules, the level of authority, the date of the first check-in, and the turnaround deadline for quotes. Writing this down alongside your team’s decision rights clarifies where a manager decides alone, where they decide after asking, and where they recommend. Every commitment also carries one named owner and one date so nothing sits unpriced between desks.

As a sample client case, an electrical contractor in Henderson with 28 employees wrote his pricing rules down and handed estimates under $25,000 to two project managers. According to the client’s own reported figures for that company, after 9 months he reviews about one estimate in five, and estimates go out in two business days rather than five. Results vary. They depend on the business, the market and the work the client does between sessions.

Review a sample instead of every estimate

A common trap after setting a dollar limit is reviewing every single estimate anyway just to be sure. Checking every file turns your managers into clerks and puts you right back in the middle of every quote.

Instead, shift to a scheduled sample review. Once a week or every two weeks, pull a small sample of completed estimates that went out under the limit, sit down with the manager, and compare their numbers against your written pricing rules. Look at how they estimated labor hours, whether they applied the right material markups, and whether any second-look condition was missed. You catch drift early, coach them on edge cases, and keep your hands off the rest of the routine files. You can also track estimates sent and turnaround time on your weekly scorecard so you see bottlenecks early without hovering over every folder.

Where to start this week

Take the last five routine estimates you priced yourself and write down the exact rules, markups, and assumptions you used on a single sheet. Pick one dollar threshold below which a manager can price using those rules, and let them prepare the next three estimates in that range for you to review together before sending.

Hand off routine estimates with clear rules

Explore how written pricing rules and clear limits apply to your estimates in a free 30-minute consultation about fit.